IRIS — Europe’s Next Hyperscale AI Data Center Campus
IRIS is a 710 MW hyperscale data center campus strategically located in Central Europe — purpose-built for AI, cloud, and high-density compute environments.
Watch Campus Overview


MWe
Total Campus Power
MWit
Deployable IT Capacity
Phase 1 Third-Party PV Solar Integration
Phase 1 Third-Party BESS Energy Storage


Strategically Positioned
Built for Europe.
Designed for the Future.
Located in Most, Czechia — just 20 km from Germany — IRIS is strategically positioned to power Central & Eastern Europe’s AI revolution with committed power, low latency connectivity and sustainable infrastructure.

Proximity To Major Markets
20 km from Germany
85 km from Prague

Low Latency Connectivity
<5ms to Frankfurt
via multiple fiber routes

Future Ready Infrastructure
Scalable, sustainable
and AI-optimized
AI-Ready Infrastructure
Purpose-Built For AI Workloads
A campus built at hyperscale

Direct Liquid Cooling (DLC)
Advanced cooling for maximum performance
Sustainability By Design
Powering A Greener Future
A campus built at hyperscale

Renewable Energy Integration
Phase 1 Third-Party 110 MW solar + 15 MW battery storage

Low-Carbon Energy Strategy
Future compatibility with nuclear and other low-carbon energy sources
Phased Development Roadmap
From Vision To Reality
A campus built at hyperscale
2027-2029
Phase 1
Initial Deployment

IRIS 3 – 50 MW – Q1 2027

IRIS 1 – 75 MW – Q2 2028

200 MW GIS Substation – Q2 2028

IRIS 4 – 54 MW – Q3 2029

IRIS 5 – 72 MW – Q3 2029
2030–2031
Phase 2
Campus Expansion

IRIS 6 & 7 – Q2 2030

IRIS 8 & 11 – Q4 2030

IRIS 9 & 10 – Q4 2030

500 MW GIS Substation – Q2 2030

IRIS 2 – 135 MW – Q4 2031
Let’s Build The Future Of AI Together
Join us in building Europe’s most advanced AI and cloud infrastructure campus.






