Europe Next Hyperscale AI

INFRASTRUCTURE CAMPUS

IRIS is a 710 MW hyperscale data center campus strategically located in Central Europe — purpose-built for AI, cloud, and high-density compute environments.

Watch Campus Overview

Hero image

0

0

MW

Total Campus Power

0

0

MW

Deployable IT Capacity

0

0

Planned IRIS Facilities

0

0

MW

MW

PV Solar Integration

0

0

MW

MW

BESS Energy Storage

Icon

Interactive Masterplan

A campus built at hyperscale

Icon

Interactive Masterplan

A campus built at hyperscale

11 Planned Facilities

11 FACILITIES. 710 MW POWER. LIMITLESS POTENTIAL.

IRIS 1

110 MW IT Load

IRIS 2-3 (HPC)

High Density AI Clusters

IRIS 4-11

Future Expansion

11 Planned Facilities

11 FACILITIES. 710 MW POWER. LIMITLESS POTENTIAL.

IRIS 1

110 MW IT Load

IRIS 2-3 (HPC)

High Density AI Clusters

IRIS 4-11

Future Expansion

Expertise Image
Bathroom renovation
Icon

Strategically Positioned

Built for europe.
Design for the future

Located in Most, Czechia — just 20 km from Germany — IRIS is strategically positioned to power Central & Eastern Europe’s AI revolution with committed power, low latency connectivity and sustainable infrastructure.

Proximity To Major Markets

20 km from Germany
85 km from Prague

Low Latency Connectivity

<5ms to Frankfurt
via multiple fiber routes

Future Ready Infrastructure

Scalable, sustainable
and AI-optimized

Icon

AI-Ready Infrastructure

Purpose-Built For AI Workloads

A campus built at hyperscale

High Density AI Compute

Designed for GPU clusters and AI training

High Density AI Compute

Designed for GPU clusters and AI training

Direct Liquid Cooling (DLC)

Advanced cooling for maximum performance

HPC Ready

Built for high performance computing at scale

HPC Ready

Built for high performance computing at scale

Hyperscale Architecture

Scalable, resilient and future-proof design

Hyperscale Architecture

Scalable, resilient and future-proof design

Icon

Sustainability By Design

Powering A Greener Future

A campus built at hyperscale

110MW Power Grid Limitations

110MW Power Grid Limitations

15 MW Battery Energy Storage System

15 MW Battery Energy Storage System

Renewable Energy Integration

Sustainable Compute For Generations

Icon

Phased Development Roadmap

From Vision To Reality

A campus built at hyperscale

2027

Phase 1

IRIS 1 Online 110 MW IT Load

2027

Phase 2

IRIS 2 & 3 (HPC) High Density AI

2029–2030

Phase 3

IRIS 4–7 Scale Expansion

2031

Phase 4

IRIS 8–11 Full Campus Scale

Let’s Build The Future Of AI Together

Join us in building Europe’s most advanced AI and cloud infrastructure campus.

Small banner image